A sewage pump is a device used for transporting and discharging liquids such as sewage, wastewater, sludge, etc., and is widely used in various fields. The installation of sewage pumps is crucial for ensuring their normal operation and extending their service life. The following is a description of the issues that need to be noted during the installation of sewage pumps:

WQ污水泵安装图

1. Installation location selection:

The installation location should be easy for maintenance, as close as possible to the sewage source, and ensure good ventilation and heat dissipation.

Choose a location that is stable, well ventilated, and has convenient drainage to install the pump station.

Avoid installing pump stations in low-lying areas that are prone to flooding to prevent flooding and affect the stability of the pump station.

Ensure that the installation location is close to the processing equipment and reduce the conveying distance.


2. Pump station infrastructure construction:

Reasonably design a stable foundation to avoid foundation settlement affecting the operation of the pump station.

Follow the regulatory requirements and install pump station supports in the foundation.


3. Pump station installation

Use professional lifting equipment to install pumps and their accessories, ensuring a stable and accurate installation process.

Follow the installation instructions to ensure that all components of the pump station are installed correctly.

Pay attention to the gap between the impeller and the pump casing during installation.


3. Connecting pipelines:

Select appropriate pipeline materials and connect the inlet and outlet pipelines of the pump station correctly.

Ensure that the pipeline connections are tight and leak free.

There should be a straight pipeline at the inlet of the centrifugal pump to prevent foreign objects from entering the pump.


4. Electrical connection

Make reasonable electrical connections based on the on-site power situation to ensure the safety and reliability of the power supply.

Check if the cable connections in the electrical system are correct and if the electrical control cabinet is safe and reliable.


5. System debugging:

After installation, perform system debugging to ensure that the pump can start and stop normally.

During the debugging process, it is necessary to check the vibration, noise, and other conditions of the pump to ensure normal operation.

Observe the system running for a period of time and check for any water leakage or seepage.


6.How to install a submersible sewage pump?

Submersible sewage pumps are usually installed in sewage tanks, lifted into the tank with lifting equipment, and fixed at the bottom of the tank.


7.How should the suction pipe of the sewage pump be arranged?

The suction pipe should be as short and straight as possible, avoiding sharp bends and undulations to prevent air resistance.


8.What sealing issues should be noted during the installation of sewage pumps?

During installation, it is necessary to ensure that the shaft seal and end cover are well sealed to prevent water leakage.


9.How to prevent vibration transmission during the installation of sewage pumps?

Install shock-absorbing pads on the foundation and use flexible joints at pipeline connections.


10. How to ensure the stability of the sewage pump after installation?

Fix the base and use anti loosening bolts to ensure horizontal installation.


11.How is the electrical wiring of the sewage pump carried out?

Connect the power cord according to the motor wiring diagram, ensure reliable grounding, and check whether the electrical components are normal.


12.How to connect the inlet and outlet pipelines of the sewage pump?

Ensure tight pipeline connections, use sealing gaskets to prevent water leakage, and prevent pipeline stress from being transmitted to the pump body.


13.How to install the control cabinet of the sewage pump?

The control cabinet should be installed in a dry and ventilated place, away from corrosive gases, for easy operation and maintenance.


14.What preparations need to be made before installing a sewage pump?

Check if the pump body and pipelines are intact, prepare necessary tools and materials, and ensure stable power supply.


The above is a description of the issues that need to be noted during the installation of sewage pumps. During the installation process, professional installation specifications and requirements should be followed to ensure that the pump station can operate safely and stably. If unsure how to install a sewage pump, it is recommended to seek installation guidance from a professional or pump manufacturer.


Related Questions


1. How To Choose A Submersible Sewage Pump
2. How do self-priming pumps work?

3. What is the difference between self-priming and non self-priming water pumps?

4. Do you need to prime a self-priming pump?

5. What is a self-priming pump?

6. What are the disadvantages of self-priming pumps?

7. What are the advantages of self-priming pumps

8.Common Faults And Solutions of Sewage Pumps

9.ZW Self-priming Sewage Pump Selection

OUR COMPANY

JUSH is a modern pump and valve enterprise integrating R&D, production, sales and service.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-18930647859          
 Room 402, Block B, Twin Building, Area 668, Xinzhuan Road, Shanghai, China
Leave a Message
Contact Us
Copyright ©️ 2023 Shanghai Jiushi Pump Manufacturing Co., Ltd. Technology by leadong.com Sitemap.